General Construction Projects
Project: Deb & Roy
This project was a total renovation and upgrade of an existing single family home that was in dire disrepair and had been
neglected for years. Starting with the removal of an enormous amount of overgrown trees, the project then moved on to the
exterior of the actual house. The slate roof was gone over and upgraded, all the rain gutter and down spouting was removed
and replaced, the entire house was power washed and then painted surfaces were repainted, freshening up the entire exterior.
The interior was then gone over from the finished basement on up including replacing the hot water boiler system, upgrading
to code the electrical and plumbing including a new bathroom and kitchen, the refinishing of all floors and repainting of all
walls, ceilings, trim and doors. Upon completion the project was professionally cleaned. The exterior grounds were upgraded
with new concrete sidewalks, a redesigned circular driveway and a new lawn. This project took 12 weeks to complete from start to finish.